Railroad Technics

Our strategic partner Zwiehoff has developed a rail guide for mounting on a wide variety of base vehicles

A trained driver needs less than 3 minutes to track up and down on an approx. 5 m long level track area. The fast changeover between road and rail results in a high degree of flexibility and makes it possible to always get to the respective job site by the fastest route. Expensive downtimes are thus avoided.

Advantages:

Low acquisition costs
Low maintenance costs
Fast changeover between road and rail (short transfer times)
No downtimes, high availability, long service life
One vehicle with many application possibilities

.